November 5, 2026
I continue with the reinforcements for the upper shock absorber mounting points. First, I fabricate the side sections—which, to my surprise, are not exactly identical on the left and right sides. Afterward, I weld the components together.


November 8, 2026
Finally, I weld both reinforcements onto the car. These two reinforcements still need to be connected by a length of round tubing. I haven’t yet decided whether to use standard tubing or the same material used for the roll cage. Next, I move on to the reinforcements between the shock absorber mounting points and the bulkhead. Creating a bent flange along a curved geometry is proving easier than I had anticipated.


November 10, 2026
Today, I weld the reinforcement connecting to the bulkhead into place. I am also looking into the setup for the master cylinder and the clutch pedal.

